- Finished up the door way, covered the cracks between the frames and caulked everything.
- Hung the RFZ panel above the mixing chair
- 90% done with the window plug. One foam piece to attach and maybe I'll paint it.
- Snaked a couple of mic cables behind the desk
This week will be tight, last week of the project at work, but I would like to get 2 cables made and figure out how I am going to attach the remaining ceiling panels. I should get the rest of the panels/frames/bags this week. Tomorrow the GIK ones, and Wednesday the Ready Acoustic stuff.
I made some reference recordings with the Shure. They sound small roomy, but that's ok considering I have 2/3 of the trapping still to do.