Finished the 6th section of drywall this morning. Two to go. One will be a piece of cake because there are no braces. The other will be a huge pain because the gas line is between the joists. The second will probably take more than a week of mornings and nights to finish. Also we had Erin's 2 year party last night :)

Next up

* Finish the last coat of compound for the closet area
* Prime and paint the closet
* Install the under-stairs bracing

* Rearrange makeshift studio to be away from the wall to continue framing
* Install insulation in the framed walls and studio ceiling
* Frame Studio wall